Winter
Snow Removal (November 1 – April 30)
Removal will commence within 24 hours of cessation of snowfalls throughout the project after every snowfall of a trace accumulation or more from all common walkways, city sidewalks, unit entryways, garage skirts, and areas around dumpsters. OR FOR COMMERCIAL: All entryways, sidewalks, loading areas, ramps and areas around dumpsters.
UNLIMITED SNOWFALLS: Includes de-icer QUOTE
Snow Plowing (November 1 – April 30)
Removal will commence within 24 hours of cessation of 2 inches or more accumulation. Plow all loading areas, parking areas and roadways.
UNLIMITED SNOWFALLS: Includes graveling QUOTE
Snow storage areas should be allocated prior to the first snow fall. Removal of stored snow from the property is separate from this quotation by Quotation Only.
Please add 5% GST to all quoted prices.